Construction Control for Removal of the Closure Segment in an Existing Prestressed Concrete Cable-stayed Bridge

LI Hong-jiang, LI Wan-heng, ZHANG Jin-quan, WANG Jiang, WANG Rong-shi

PDF(883 KB)
Journal of Highway and Transportation Research and Development ›› 2008, Vol. 25 ›› Issue (8) : 61-66.

Construction Control for Removal of the Closure Segment in an Existing Prestressed Concrete Cable-stayed Bridge

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}. {{journal.qiKanMingCheng_EN}}. 2008, 25(8): 61-66

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(883 KB)

Accesses

Citation

Detail

Sections
Recommended

/