Study on Ventilation System During Construction of Complicated Tunnel with Great Variety Section Drilling and Blasting Method

YANG Heng-ping, GUO Xiao-song, ZHANG An, ZHANG Bao-sheng

PDF(243 KB)
Journal of Highway and Transportation Research and Development ›› 2003, Vol. 20 ›› Issue (2) : 47-50.

Study on Ventilation System During Construction of Complicated Tunnel with Great Variety Section Drilling and Blasting Method

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}. {{journal.qiKanMingCheng_EN}}. 2003, 20(2): 47-50

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(243 KB)

Accesses

Citation

Detail

Sections
Recommended

/